    BIM Services facilitate construction professionals to obtain complete control of these projects. Interference among building systems can be checked with 3D BIM Modeling. Construction companies, implementing BIM in their work processes are able to visualize schematic structures before construction, offering better project plans. Clashes get easily detected, eliminating system conflict before installation. Dedicated 3D BIM Modelers streamline process across building lifecycle empowering professionals to have a complete view of the construction.

    Let’s now check out the way the constructional professionals can get complete control of construction with BIM?

    � Reviewing Constructability Issues – Proficient Engineers work with 3d to 6d BIM, facilitating project coordination, asset management, logistic planning and accurate cost estimate. BIM really helps to resolve constructability issues by learning inconsistency in the input drawings, incomplete information, dimension error in plan and section drawings and much more. The engineers can make real cause analysis for the dimension errors, resulting in clashes. Moreover, how big is the structures could be revised, incorporated and relocated. So as to take an example, if beam is clashing with window, how big is the window could be revised. If floor and beam cut-out are missing in drawing, cut-out could be incorporated. Furthermore, if manhole is clashing with structure, the manhole location can be shifted.

    � Visualizing Construction Sequence – The complete sequence of construction could be visualized with 4D BIM, which helps project stakeholders in visualizing the whole group of construction events, understanding the progress of construction activity, throughout the lifetime of project. BIM Surveys Whitnash of construction could be associated with BIM Model showing real time simulation in an animated video. Based on 4D Presentation, planned vs. actual construction sequence can be compared throughout project lifecycle. Construction planners can explore 4D simulation to measure the need for proposed design on construction schedule and work process. They can detect clashes, enhance construction schedule, track materials and manage supply chain. 4D BIM acts as a robust communication tool among project stakeholders, leading to better understanding of project milestone and construction plan. Delays and rework are minimized, helping project team to carefully plan and coordinate operations right down to last detail both in time and space.

    � Saving Cost & Time – BIM really helps to save significant money and time for the project. Cost can be saved for labor, MEP items, dismantling, rework, reinforcement validation, design changes and more. Total man days are also saved from BIM like man-days for civil stuff like concrete steel reinforcement, finishing, shuttering, interior items, fa�ade, man-days for dismantling and man-days for rework. Revit design and fabrication model in Navisworks can be combined to avoid the expense of rework from the existence of clashes.

    Implement BIM technology solution for construction to increase profits on return, saving time and aiding successful project execution. BIM plays an essential role in design optimization, coordination and construction management. Adopt BIM and facilitate design disciplines to collaborate in a flawless manner, enhancing work efficiency, reducing errors, verifying aesthetic looks and enhancing building performance.