    BIM Services facilitate construction professionals to obtain complete control of their projects. Interference among building systems could be checked with 3D BIM Modeling. Construction companies, implementing BIM in their work processes have the ability to visualize schematic structures before construction, offering better project plans. Clashes get easily detected, eliminating system conflict before installation. Dedicated 3D BIM Modelers streamline process across building lifecycle empowering professionals to get a complete view of the construction.

    Let’s now have a look at the way the constructional professionals will get complete control of construction with BIM?

    � Reviewing Constructability Issues – Proficient Engineers work with 3d to 6d BIM, facilitating project coordination, asset management, logistic planning and accurate cost estimate. BIM helps to resolve constructability issues by learning inconsistency in the input drawings, incomplete information, dimension error in plan and section drawings and much more. The engineers can make root cause analysis for the dimension errors, resulting in clashes. Moreover, the size of the structures could be revised, incorporated and relocated. So that you can take an example, if beam is clashing with window, how big is the window can be revised. If floor and beam cut-out are missing in drawing, cut-out could be incorporated. Furthermore, if follow this link is clashing with structure, the manhole location could be shifted.

    � Visualizing Construction Sequence – The complete sequence of construction could be visualized with 4D BIM, which helps project stakeholders in visualizing the whole group of construction events, understanding the progress of construction activity, through the entire lifetime of project. The sequence of construction could be associated with BIM Model showing real time simulation within an animated video. Predicated on 4D Presentation, planned vs. actual construction sequence can be compared throughout project lifecycle. Construction planners can explore 4D simulation to assess the significance of proposed design on construction schedule and work process. They are able to detect clashes, enhance construction schedule, track materials and manage supply chain. 4D BIM acts as a powerful communication tool among project stakeholders, resulting in better understanding of project milestone and construction plan. Delays and rework are minimized, helping project team to carefully plan and coordinate operations right down to last detail both with time and space.

    � Saving Cost & Time – BIM helps to save significant money and time for the project. Cost could be saved for labor, MEP items, dismantling, rework, reinforcement validation, design changes and more. Total man days are also saved from BIM like man-days for civil items like concrete steel reinforcement, finishing, shuttering, interior items, fa�ade, man-days for dismantling and man-days for rework. Revit design and fabrication model in Navisworks can be combined to avoid the cost of rework from the existence of clashes.

    Implement BIM technology solution for construction to increase profits on return, saving time and aiding successful project execution. BIM plays an essential role in design optimization, coordination and construction management. Adopt BIM and facilitate design disciplines to collaborate in a flawless manner, enhancing work efficiency, reducing errors, verifying aesthetic looks and enhancing building performance.